Sydney Metro (Rail)

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed tincidunt erat ut tellus finibus, vitae tempor mauris suscipit. Fusce eleifend congue faucibus. Ut consequat nibh sed sagittis posuere. Sed ut suscipit nibh. Phasellus malesuada ut neque blandit luctus. Ut dignissim velit ultrices, efficitur magna quis, porta nisl. Interdum et malesuada fames ac ante ipsum primis […]

Cross River Rail – New Gold Coast Stations

New Gold Coast Station - Cross River Rail Project

The New Gold Coast Stations program is a critical part of the infrastructure solution designed to boost capacity of the rail corridor in conjunction with the delivery of Cross River Rail. The three stations were concurrently procured over 15 months within a rapidly changing and challenging infrastructure delivery marketplace. The challenge was to enhance the […]

Merrimac Station

Merrimac Rail Station - New Gold Coast Stations

The Merrimac Station is one of the three new rail stations to be delivered as part of the New Gold Coast Stations Program by the Cross River Rail Delivery Authority. The project consisted of the design and construction of the new Merrimac train station and supporting infrastructure. The new station was required to integrate effectively […]

Cross River Rail (TSD, RIS, ETCS, PIC)

Cross River Rail Track - Concept Visualisation

Cross River Rail is a new 10.2km heavy rail line through central Brisbane that includes a new 5.9km twin tunnel under the Brisbane River and CBD, four new underground stations, and a new above-ground station. It also includes brownfield upgrades and a new train control system. The project packages included: Invited by senior executives, Delta […]

Gold Coast Light Rail
 Stage 3

Cross River Rail - New Gold Coast Station

Gold Coast Light Rail Stage 3 (GCLR3) involved a 7km extension in a brownfield urban area from Broadbeach South to Burleigh Heads and includes the procurement of eight new stations, additional light rail vehicles and a stabling depot upgrade. GCLR3 consisted of a multi-stream delivery strategy and program of works. It required the engagement and […]