Transport Systems Integration Project was an Australian first project for Transurban, a contract that covers the installation of an integrated management system for road assets and three tunnels: Legacy Way (4.6km), Airport Link (6.7km) and Clem7 (4.8km) located in Brisbane into a single control centre.
The centre is expected to help improve the efficiency and safety of the road network.